hiring a professional. Here you are:
• If you have an old floor before I remove it completely. Clear the surface of the nails and glue to make it smooth. Make sure there are no cracks in the ground. Now install a plate of cement concrete or cement board underlayment thickness of 8.6 inches before placing the tiles.
• Lift the right one for your bedroom, office, living room, kitchen and bathroom. High gloss is perfect for the last two quarters. If tiling to withstand the onslaught of water, go for ceramics. But it is safe to use those that are less than one square. Fort, ceramics, for great are quite likely to break.
• First divide the room into four parts selected and start the installation from the point of intersection. The coatings must start from the middle of the laying floor tiles to the sides, so the end pieces of tile edges are the same size.
• Placing all entire slab on the ground, maintaining a gap of about 0.25 inches apart. Plastic spacers may be used. As you continue on the edges, use solid floors to help you kneel on. Now the rest of pottery to cut with a tile cutter correctly. If you go for the placement of harder materials such as marble, saw wet in place is needed.
Fill gaps in the middle with enough grout properly. Use flat sponge to clean the surface of the residue.